Design & Build

A clear path from first walk to final grooming.

One connected process for the site below, the turf system on top, and the performance details that make it work.

Start a conversation
All American Turf / Design & Build

Decisions that stay connected

Plan the whole facility.
Build it as one system.

Great fields are not assembled from disconnected decisions. Layout affects earthwork. Earthwork affects drainage. Drainage affects base construction. The finished system affects care, safety, and operating costs.

Our design-build approach keeps those relationships visible from the beginning and gives the owner one team responsible for carrying the plan through construction.

Our process

Seven stages.
One accountable team.

01

Discover

Walk the site, understand users and schedules, document existing conditions, and define what success looks like.

02

Plan

Develop layout, system options, preliminary scope, phasing, budget ranges, and a practical path forward.

03

Engineer

Coordinate survey, grading, drainage, base, transitions, details, product requirements, and approvals.

04

Prepare

Mobilize, protect the site, complete demolition and earthwork, establish drainage, and build the base.

05

Install

Lay out and cut the turf, complete seams and inlays, place infill, add lines and graphics, and finish-groom the surface.

06

Turn over

Complete final grooming, verification, documentation, staff orientation, and opening-day preparation.

07

Support

Establish care intervals, inspections, repair response, and long-range replacement planning.

Decisions made early

What we help owners resolve.

The sooner the right questions are answered, the fewer surprises appear during construction.

01

Who will use the facility—and how often?

02

New construction, renovation, or replacement?

03

Which sports and line packages must coexist?

04

What drainage and base conditions exist today?

05

What safety and impact-performance goals apply?

06

Which turf components belong in the base scope?

07

How should work align with the playing calendar?

08

What maintenance resources will be available?

Responsible lifecycle planning

Think beyond installation day.

We help teams consider water use, maintenance inputs, material options, heat, reuse, recycling pathways, and the eventual replacement cycle as part of the system decision.

  • Compare material and infill options
  • Plan for repairability and component life
  • Review removal and recycling pathways
  • Match maintenance expectations to staffing

Bring us in early

The best time to solve a field problem is on paper.

Schedule a project conversation